![]() This contract will provide for the planning, designing, implementation, enhancement, evaluation, integration, testing and conducting of the flight dynamics services and systems at the agency's Goddard Space Flight Center in Greenbelt, Maryland for the Navigation and Mission Design Branch. The ordering period is for five years, which will begin Nov. There is a 45-day phase-in, scheduled to commence on Sept. The small business set-aside, cost-plus-fixed fee, indefinite delivery/indefinite quantity contract has a minimum ordering value of $3 million and a maximum ordering value of $180 million. Green Building Council Leadership in Energy and Environmental Design (LEED) standards.Ĭontract options announced Thursday include seven dual station electric vehicle battery charge stations in parking areas and the use of LED light fixtures instead of fluorescent and compact light fixtures.NASA has awarded the Flight Dynamics Support Services (FDSS) II contract to Omitron, Inc. The new headquarters building will strive to achieve platinum certification under the U.S. NASA in 2011 awarded an architectural contract worth up to $25 million for design and engineering development of the Central Campus Complex. "The Central Campus concept supports efforts to slowly, but strategically, recapitalize dispersed non-hazardous functions and capabilities into more efficient facilities with a smaller operational footprint," states the plan's executive summary. The consolidation effort is a "major component" of the center's recently released 20-year master plan. Some facilities, like a launch pad, former shuttle hangars and a runway, are being leased to commercial companies or other government agencies. With the shuttle program's retirement in 2011 and tight budgets for space programs and keeping the center running, KSC is trying to "right-size" a sprawling inventory of more than 700 facilities on the 140,000-acre spaceport, a number of which NASA no longer need. "With a constrained budget forecast, we owe it to ourselves to look at options of how to operate the Center in a more sustainable manner." "We're going to see a dramatic return on investment with new facilities," Trey Carlson, KSC's master planner, said in the 2012 release. NASA estimates the consolidation and reduced operations and maintenance costs will save $400 million over 40 years. Overall, Central Campus plans call for the demolition of about 900,000 square feet of space and construction of modern facilities taking up half as much area. The project was expected to be completed in two phases, according to a 2012 press release. The first floor will house a cafeteria with an indoor-outdoor seating area, a credit union, barber shop, post office, large lobby with displays, gift shop, library and other services.įloors two through seven feature offices, conference rooms and break areas, topped by an eighth floor of mechanical support systems.Īn artist's rendering shows one side of the rectangular structure anchored by a slightly taller, curving white tower. NASA did not detail the new building's design Thursday, but a contract solicitation last year said it would stand eight stories tall and total about 200,000 square feet. It will replace the center's existing headquarters, a roughly 50-year-old building that eventually will be razed. The new building will be the centerpiece of what KSC calls the Central Campus, an initiative to replace aging Industrial Area facilities with more energy-efficient structures occupying a smaller footprint. NASA on Thursday announced the award of a two-year, $64.8 million contract to build the multi-story structure to Hensel Phelps Construction Co. A gleaming and "green" new headquarters building will rise at Kennedy Space Center over the next two years.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |